Entry # 140

Hemlock Custom

Designer: Ryan Solman

Customer: Hemlock Custom Build

Installation Location: Lake Joseph (Muskoka, Ont.)

Brief overview of the project

Triangle Tube condensing boiler feeding hydronic air handler which feeds both main floor and basement level as well as infloor in basement. 

We installed a Caleffi 5495 Series SEP4 hydraulic separator to handle our air and dirt separation requirements, as well as hydraulic separation requirements.

Design goal

Our goal was to be able to provide inexpensive hot water generation for domestic hot water use and space heating.  This is a new build, so feed back so far is minimal but we anticipate our client will be happy. 

 

Installation description

This is a new, custom built 5000 sq. ft cottage on Lake Joseph in Muskoka.