Entry # 181

New Bedford Project

Designer: Michael Grella

Installation Location: New Bedford, MA

Brief overview of the project

Old house with a failed heating system. Installed two cascaded Navien NHB 150 boilers with a Caleffi 1-1/4" 5495 Series SEP4 (with magnetic separation) and 573 Series AutoFill valve.

 

 

Design goal

Minimize redundancy and maximize efficiency 

Installation description

New install 

System performance

Great!  Home owner is very happy.

Image gallery