Entry # 66

Aldergrove Border Crossing

Designer: Nick Fletcher

Customer: Aldergrove, BC

Installation Location: Aldergrove Border Crossing

Brief overview of the project

New Canada to United States border crossing.  Hydronic junction was used as part of a Triangle Tube Cascade Multiple Boiler Distribution Manifold.

Design goal

Used for heating.

Installation description

New installation; no challanges as it came as part of the manifold system.

System performance

Has not been fully installed at this point.

Image gallery